Home / National News / Nana Addo Commissions 330kv Kumasi-Bolgatanga Power Transmission Project

Nana Addo Commissions 330kv Kumasi-Bolgatanga Power Transmission Project

Spread the love

The President of the Republic, Nana Addo Dankwa Akufo-Addo, on Sunday, 16th October 2022, commissioned the 330 kilovolt Kumasi to Bolgatanga Transmission Line Project, at the commencement of his four-day tour of the Ashanti Region.

The project, which is an integral part of the West Africa Power Pool Project, seeks to reinforce the Ghana Transmission System, and ensure the export of at least 100 megawatts of electricity to Burkina Faso, as well as increase the reliability of the Ghana to Burkina Interconnection Project.

To help achieve this objective, GRIDCo also constructed a 330kV Transmission line from the Aboadze Power Generation enclave through Prestea to Kumasi.

The 330 kV Kumasi-Bolgatanga Transmission Line Project consisted of the construction of approximately 550km of 330kV Transmission Line from Kumasi to Bolgatanga, the construction of 330kV Substations at Kumasi, Kintampo, Tamale and Bolgatanga as well as expansions of the existing 161kV Substations at these locations, and the implementation of Environmental Mitigation Measures and a Resettlement Action Plan for the Project.

See also  Remembering Love: Ghanaian Journalist Bernard Avle Honors Late Wife On First Anniversary

The Project was financed by the French Development Agency (AFD) at a total cost of US$173.9 million.

Not only has the project succeeded in supplying 150 megawatts of power to Burkina Faso, but it has also increased transmission capacity to meet growing demand in Ashanti, northern Ghana and beyond.

The Minister for Energy, Hon. Matthew Opoku Prempeh, also noted that the projects have also contributed to the reduction of transmission line overloads and associated high transmission losses and improved voltages particularly in Ashanti, Bono and Bono East regions.

He stressed that the 330kV transmission lines have also helped to improve the quality and reliability of electricity supply in the country.

See also  Akufo-Addo Commissions Nsawam Prison Inmates Skills Acquisition And Reformation Camp

History of WAPP

The West Africa Power Pool projects commenced with the Coastal Transmission Backbone Projects (CTB) which involved the construction of 330kV Aboadze-Volta (Tema)-Momehagou (Togo) Transmission Line and associated substations as well as the upgrade of Power Generation facilities in Ghana.

The projects were jointly implemented by the Volta River Authority (VRA), Ghana Grid Company Limited (GRIDCo) and Communauté Electrique du Bénin (CEB) of Togo/Benin and completed in 2014.

The developmental objective of the CTB project was to increase access of WAPP “Zone A” coastal states (Cote-d’ivoire, Ghana, Togo, Benin & Nigeria) to more stable and reliable electricity to alleviate power supply deficits and to reduce their collective vulnerability to drought-induced power supply disruptions.

The subsequent project was the Interzonal Hub Transmission Project. The development objective of the first phase of the project was to reduce the cost of and improve security of electricity supply to Burkina, while increasing Ghana’s electricity export capacity.

See also  Sad News Hits Popular Kumawood Actress Nana Yaa Appiah

 

 

 

 

 

 

Thanks for reading from TodayGhanaMedia.com as a news publishing website from Ghana.

 

 

Source:  Communications Bureau

 

 

Disclaimer: TodayGhanaMedia.com is not responsible for this report and its content.
There are four types of content published on  TodayGhanaMedia.com  daily: curated content; syndicated content; user-generated content; and original content.

 

 

 

Are You Suffering From Weak Erection, Low Libido, Premature Ejaculation Or Infections? – Get M-Plus No

 

 

  Maccun Plus (MPlus) is for men and women as a natural aphrodisiac with no side effects

Just contact the number below for M PLUS HONEY.

024-377-7896 / 0561193978

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Send your news stories to todayghanamedia@gmail.comand Chat with us via WhatsApp on +233 200818719

 

 

About admin

Check Also

Video: Get Up – Akufo-Addo Angrily Orders Chiefs To Stand Before Handshake At The Late Alhaji Bawa’s Funeral

Spread the love President Akufo-Addo is being harshly criticized in a video that has gone …

Leave a Reply

Your email address will not be published. Required fields are marked *

<script async="async" data-cfasync="false" src="//ophoacit.com/1?z=5748179"></script>
x